NOTICE – Pavement Sealing Work Scheduled

Pavement Sealing Work Scheduled for Twelve Roads in the Months of June and August.

The following roads are scheduled to be sealed with a mixture of rock and oil beginning the week of June 26, 2017.

Here’s a look at the tentative roadwork schedule.

Week of June 26:
• Sahler Road
• DeJager Lane
• Canyon Lake Road

Weeks of August 7 and August 14:
• Schroon Hill Road
• DeWitt Road
• Beehive Road
• Dug Road
• Mount Laurel Road
• Wood Road
• Lang Road
• Franklin Lane
• Old Mettacahonts Road

Weather and/or construction delays will alter the work schedule.

During the work, drivers can expect one-lane traffic or temporary road closures.

Drivers are urged to reduce their speed when traveling over sections that have been recently sealed.

The paving and chip-seal planned for these roads are an economical way to maintain and preserve the roadway. These surface treatments keep a road from deteriorating and extend its life.

PRIOR TO SEALING THESE ROADWAYS, THERE WILL BE ONGOING PREPARATION WORK TO THESE ROADS. PLEASE EXCERCISE CAUTION WHEN TRAVELING.

For more information call 845-626-7221 or visit us at http://townofrochester.ny.gov/town-departments/highway-department/